With the main part of the roof poured, ventilation must be rerouted on the
roof, and work can be started on the vaulted roof for the Science library.
|
West Section
|
Forms (rectangular pieces) are stripped along the perimeter of the western
roof section, which is becoming a staging area for ventilation work on
the existing building.
|
|
A closer view of the preparations for work on the ventilation ducts on the
roof of the existing Science building. New ducts and pipes are seen at the
right of the picture on top of the new roof.
|
|
The Vaulted Roof of the Science Library (Central Section)
|
Looking north, forms for the vaulted roof take shape. The rounded forms
are now about half done, starting on the eastern side.
|
Looking downward from the crane, the top of the columns peaks through the
beams that will extend along the vault.
|
|
Steel supports are placed to support the vault forms for the western roof
of the Science library.
|
|
The Central Section
|
Looking south toward the courtyard, the newly-poured roof provides a
staging area for the rebar for the vaulted roof.
|
|
Looking downward into the courtyard with the existing Science building
beyond.
|
|
East Section
|
Looking from the crane tower toward the southeast, the roof of the third
floor appears in the foreground and the base of the greenhouse appears in
beyond
|
The third-floor roof extends to the north (below) and east (left) of the
greenhouse, and low walls provide a base for the greenhouse area.
|
|
A closer view of the greenhouse area.
|