The following pictures show several views from the tower crane. Most
pictures include the central section — often looking beyond to
another section. Views progress counterclockwise, starting at the west.
|
Looking Toward the West
|
Looking Westward along Eighth Avenue: Concrete is poured in the western
section (near top and the existing building); rebar and conduit are
visible in the central section (near the bottom)
|
|
Looking Westward: Viewing much of the site, decking and flooring pans are
being installed on the east (bottom), rebar is being added in the central
section (middle) with electrical conduit included (right), and concrete is
poured on the west (top)
|
Western section: The poured concrete floor serves as a staging area
for installation of rebar and conduit in the central section (seen at left).
|
This view looks toward the southwest:
-
The greenhouse will occupy the area above, near the courtyard.
-
Computer science will occupy much of the area below and to the right, hence
the extensive conduit runs found within the rebar.
A wooden divider may be seen from just left of top center and progressing
to just right of the bottom center. This divider will provide the
boundary for pouring the central section (right).
|
|
Looking toward the eastern and central sections:
-
Rebar begins to take shape in the region of the future greenhouse,
near the courtyard (upper right).
-
Base decking is largely in place for the eastern section (on left), and the
next step is adding pans for the floor.
|
Looking closer at the northern part of the central section, the rebar and
electrical conduit are clearly visible in the areas for CS/math classrooms,
CS labs, and CS offices.
|
|
Looking from the central section toward the east, rebar and conduit are
largely complete in the north-central area. Progressively more work must
be done toward the courtyard (right) and east (above).
|